Engineering Quality Control

All inspection equipment is calibrated to N.A.M.A.S standard & checked every 3 months as routine, and as required before inspection of component is carried out. Tolerances above ±.1mm are carried out by operator unless further control is required.

Inspection stainless steel Tig Welding Facility

Ultrasonic Cleaning

At FPE we have a range of ultrasonic cleaning baths & Drying cabinets to clean those components that have to be oil and dirt free on delivery.

Ultrasonic Cleaning Ultrasonic Cleaning

Traceability

All orders are checked against Drawing Issue Levels, Prices & delivery dates agreed, and are acknowledged by fax or email. Once booked in each item on order is given a “job” or route card with the required operations marked up and signed by the engineer as each operation is carried out. Once the job is completed & inspected the details from the job card are recorded on the packing label, and delivery note.